![]() The data presented on this page does not represent the view of Camp Cheerio and its employees or that of Zippia.Ĭamp Cheerio may also be known as or be related to Camp Cheerio. None of the information on this page has been provided or approved by Camp Cheerio. While we have made attempts to ensure that the information displayed are correct, Zippia is not responsible for any errors or omissions or for the results obtained from the use of this information. ![]() Sources of data may include, but are not limited to, the BLS, company filings, estimates based on those filings, H1B filings, and other public and private datasets. The data on this page is also based on data sources collected from public and open data sources on the Internet and other locations, as well as proprietary data we licensed from other companies. The employee data is based on information from people who have self-reported their past or current employments at Camp Cheerio. Not Available Dams for which the downstream hazard potential is restricted to approved government users.Zippia gives an in-depth look into the details of Camp Cheerio, including salaries, political affiliations, employee data, and more, in order to inform job seekers about Camp Cheerio. Undetermined Dams for which a downstream hazard potential has not been designated or is not provided. Losses are principally limited to the owner's property. Low Dams assigned the low hazard potential classification are those where failure or mis-operation results in no probable loss of human life and low economic and/or environmental losses. Significant hazard potential classification dams are often located in predominantly rural or agricultural areas but could be in areas with population and significant infrastructure. The latitude and longitude coordinates (GPS waypoint) of Camp Cheerio are 36.4015207 (North), -81.0170235 (West) and the approximate elevation is 2,913 feet (. Significant Dams assigned the significant hazard potential classification are those dams where failure or mis-operation results in no probable loss of human life but can cause economic loss, environment damage, disruption of lifeline facilities, or impact other concerns. Hazard Potential Classification High Dams assigned the high hazard potential classification are those where failure or mis-operation will probably cause loss of human life. Not Available Dams for which the condition assessment is restricted to approved government users. Not Rated The dam has not been inspected, is not under state or federal jurisdiction, or has been inspected but, for whatever reason, has not been rated. Unsatisfactory A dam safety deficiency is recognized that requires immediate or emergency remedial action for problem resolution. Investigations and studies are necessary. POOR may also be used when uncertainties exist as to critical analysis parameters which identify a potential dam safety deficiency. Note: Rare or extreme event is defined by the regulatory agency based on their minimum Poor A dam safety deficiency is recognized for normal operating conditions which may realistically occur. Risk may be in the range to take further action. Rare or extreme hydrologic and/or seismic events may result in a dam safety deficiency. Fair No existing dam safety deficiencies are recognized for normal operating conditions. Acceptable performance is expected under all loading conditions (static, hydrologic, seismic) in accordance with the minimum applicable state or federal regulatory criteria or tolerable risk guidelines. Condition Assessment Satisfactory No existing or potential dam safety deficiencies are recognized.
0 Comments
Leave a Reply. |